- Detailed Description
Woman’s Sanitary Pad Machine — MS318SPM:
A.. Live Video:
B. Characteristics:
1. Easier Operation
2. Easier Adjusting
3. Easier Mold Changing
4. Easier & Less Maintenance
5. Stable-working, More Speed
6. Long-lived
7. Less Labor Force
8. Fully Automatic, Higher Efficiency
C. SUPPLY DESCRIPTIONS:
Specifications of sanitary napkins (one length with thick type or ultra thin type as buyer’s samples and request)
- Technical parameters:
- Power consumption: 48KW
1) 380V 50HZ Alternation current, for main motors.
2) 220V 50HZ Alternation current, for heating system.
Producing speed: 200 – 300pcs/min
Air consumption and pressure: 1000 liter/min 8-10 Bars
Wastage rate: ≤2%
Weight: ≈ 18T
Dimension: 18m*2.8m*2.2m (L*W*H)
CONFIGURATION:
- 10mm×10mm stable square steel frame, 18mm face plate and 16mm floor plate strengthen the fixedness of structure.
- Quantitative forming system forms average cotton cores with equal weight which is adjustable by stepless gearbox..
3.Cutters and molds are adjusted by air-driving device, which is easy to operate and extends life of cutter and molds.
4.Capable of producing various sanitary napkins: cotton core style, tissue, triple, cubic protective and chemicals added type as well.
5.Main frame and single alignment device or an independent packing machine cooperate to work; the sanitary napkins runs vertically and horizontally on special devices before run into fast & easy packing machine that is available on demand.
6.Two levels driven by two axles are designed to work independently. The machine with two levels of gears save time when changing between specifications.
7.Change phases to help control air-switches, which is easy and efficient.
8.It is made of mixed transmission with synchronized wheel , universal joint and synchronized belts. On the one hand, the transmission is stable, smooth and lessen noisy. On the other hand, it maintains the machine life.
9.Screw gears are protected by cast shield box with lubricating oil inside to maintain precision, lessen noise and extend long life.
10.Key parts are equipped with emergent switches so as to operate the whole machine conveniently.
EQUIPMENT LIST
Crush machine & forming system 1 set
Main machine 1 set
Suck wind machine 6 sets
Hot melt applicator ( glue machine) 2 sets
Three folded and fast & easy packing machine 1set
- Arrange & convey system 1set
PRODUCTION CONSISTS PARTS
Fluff pulp or airlaid paper
SAP
Tissue paper
Non woven cloth or apertured film
Hot melt adhesive
Silicon paper
PE film
Packing film
Single adhesive tape
PROCESS OF MAKING
Crush fluff pulp
Adding SAP
Wrap fluff pulp with tissue paper
Cotton core forming or cut air-laid paper
Adding non woven cloth or apertured film
Embossing
- Applying PE-Film
7) Heat sealing edge
8) Stick silicon paper on the middle of back film
9) Stick silicon paper on wings
10) Fast & Easy packing film
11 Single adhesive tape
12) Heat sealing & cutting
- Arrange & convey final products.
GLUING SYSTEM
Stick the cotton core or air laid paper to the PE-Film and Non woven cloth or apertured film
Stick silicon paper to the back side.
Stick silicon paper to the double wings.
DEVICE OF FEEDING MACROMOLECULE CHEMICALS (SAP)
This device is connected with the main machine. It could feed SAP in the middle of cotton core .
THE ORIGIN OF MAIN PARTS
NAME | BRAND | COUNTRY |
FREQUENCY CONVERTER | INVT OR CHINSC | TAIWAN |
MAIN MOTOR | SIEMENS | GERMANY & CHINA |
TEMPERATURE CONTROLLER | HB | CHINA |
LOW VOLTAGE ELEMENTS | DELIXI & CHNT | CHINA & GERMANY |
SOLID RELAY | OMRON & FENGHUA | JAPAN & CHINA |
KEY BEARING | NSK & SKF | JAPAN & SWEDEN |
OTHER BEARING | HRB & ZWZ | CHINA |
SYNCHRO BELT | MITSUBISHI | JAPAN |
GLUE MACHINE | ANJIE OR JINXIN | TAIWAN |
TRANSMISSION BELT | MITSUBISHI | JAPAN |
ARC CUTTER | SANMING | CHINA |
PNEUMATIC ELEMENT | AIRTAC OR CAAP | TAIWAN |
GUARANTEE AND AFTER-SALES SERVICE
12 months (from delivery date). Within this period, in case any man-made misoperation or damage of the machine parts caused by the buyer, the charges for spare parts should be borne by the buyer; while non man-made misoperation or damage of the machine parts, the charges should be borne by the seller. If the buyer required seller’s engineer to the buyer’s factory to support some technical service, all the expenses for seller’s engineer will be charged to the buyer.
Buyer can send their staff to be trained in seller factory, the Seller will arrange free food and accommodation for them, the buyer should bear their round-trip tickets. If the Buyer needs the Seller to send engineers to buyer’s country for installing and repairing the machine. All the expenses including round-trip tickets, food and hotel fees for seller’s engineer will be charged to the buyer.Within 20 days,the Buyer will not bear the Seller engineers’ salary; beyond 20 dyas,the Buyer should bear the concerning salary.
MACHINE TEST AT SELLER PLANT AND BUYER PLANT
Test run at seller’s site:
The machine will be tested in the Seller plant and all sizes and shapes foreseen in the contract will be tested, at the presence of a Buyer’s technician, using raw materials supplied by the Seller.
Buyer’s engineers should be at attendance of check & acceptance test according to time and schedule fixed by the Seller. 10 minutes of constant production of the machine for the size need to be done to check the quality, function and production of the machine. To pass the test the efficiency rate has to be more or equal to 85%, while the waste rate has to be less than 2%. Test run certificate need to be signed in duplication by mutual Parties at the end of the test. The signature of the Test run certificate authorizes the shipment of the machine.
Test run at buyer’s site:
The final acceptance test to be done in the Buyer’s plant and raw materials cost will be at Buyer’s charge.Due to the buyer’s responsibility (no constant raw materials quality, no on time raw material refurnishing, electrical power supplying problems, and any other factory problems), the machine can not be tested, it will be regarded as passing test run at buyer’s site.
QUOTATION:
PAYMENT WAY: 30% T/T paid in advance as deposit, the balance will be paid before shipment after buyer inspect the finished machine for quality and quantity in seller factory.
DELIEVERY TIME: The ordered machine will be made shipment within 80 working days after seller receive deposit from buyer.