Home » Product » Sanitary Pads Machines » Woman’s Sanitary Pad Machinery — MS318SPM
Woman’s Sanitary Pad Machinery — MS318SPM

Woman’s Sanitary Pad Machinery — MS318SPM

Product Details
  • Place of Orign : Xiamen
  • Brand Name : MS
  • Certification :
  • Model Number : MS318SPM
Payment & Shipping Terms:
  • Minimum Order Quantity : 1 set
  • Price : Contact for price
  • Packaging Details : Export Wooden Pallet
  • Delivery Time : Within 90 days after deposit effected
  • Payment Terms : 30% T/T deposit before production, balance before delivery
  • Supply Ability : 8 sets each month
Inquire Live Video
  • Detailed Description

Woman’s Sanitary Pad Machinery — MS318SPM:

A.. Live Video:

B. Characteristics:

1. Easier Operation
2. Easier Adjusting
3. Easier Mold Changing
4. Easier & Less Maintenance
5. Stable-working, More Speed
6. Long-lived
7. Less Labor Force
8. Fully Automatic, Higher Efficiency


C. 
Technical parameters:

  1.  Power consumption: 58KW

1) 380V 50HZ Alternation current, for main motors.

2) 220V 50HZ Alternation current, for heating system.

Design speed: 300pcs/min;  Producing speed: 180-250pcs/min for two different lengths

Air consumption and pressure: 1000 liter/min  8-10 bars

Wastage rate: ≤2%

Weight: ≈ 20T

Dimension: 21m*2.5m*2.8m (L*W*H)

 

CONFIGURATION:

  1. 12mm×12mm stable square steel frame, 20mm face plate and 16mm floor plate strengthen the fixedness of structure.
  2. Double cutters, double molds and double conduction channels are equipped on one machine instead of two machines. It can produce two length products.
  3. Cutters and molds are adjusted by air-driving device, which is easy to operate and extends life of cutter and molds.
  4. Capable of producing various sanitary napkins: cotton core style, tissue, triple, cubic protective and chemicals added type as well.
  5. Main frame and single alignment device or an independent packing machine cooperate to work; the sanitary napkins runs vertically and horizontally on special devices before run into fast & easy packing machine that is available on demand.
  6. Two levels driven by two axles are designed to work independently. The machine with two levels of gears save time when changing between specifications.
  7. Change phases to help control air-switches, which is easy and efficient.
  8. It is made of mixed transmission with synchronizedwheel , universal joint and synchronized belts. On the one hand, the transmission is stable, smooth and lessen noisy. On the other hand, it maintains the machine life.
  9. Screw gears are protected by cast shield box with lubricating oil inside to maintain precision, lessen noise and extend long life.
  10. Key parts are equipped with emergent switches so as to operate the whole machine conveniently.

 

EQUIPMENT LIST

  1. Crush machine & forming system             1 set
  2. Main machine                             1 set
  3. Suck wind machine                         6 sets
  4. Hot melt applicator ( glue machine)            2 sets
  5. Three folded and fast & easy packing machine   1set
  6. Arrange & convey system                    1set

 

PRODUCTION CONSISTS PARTS

Fluff pulp or airlaid paper

SAP

Tissue paper

Non woven cloth or apertured film

Hot melt adhesive

Silicon paper

PE film

Packing film

Single adhesive tape

 

PROCESS OF MAKING

Crush fluff pulp

Adding SAP

Wrap fluff pulp with tissue paper

Cotton core forming or cut air-laid paper

Adding non woven cloth or apertured film

Embossing

7)  Applying PE-Film

8)  Heat sealing edge

9)  Stick silicon paper on the middle of back film

10)  Stick silicon paper on wings

11)  Fast & Easy packing film

12)  Single adhesive tape

13)  Heat sealing & cutting

14)  Arrange & convey final products.

 

GLUING SYSTEM

Stick the cotton core or air laid paper to the PE-Film and Non woven cloth or apertured film

Stick silicon paper to the back side.

Stick silicon paper to the double wings.

 

DEVICE OF FEEDING MACROMOLECULE CHEMICALS (SAP)

This device is connected with the main machine. It could feed SAP in the middle of cotton core .

 

THE ORIGIN OF MAIN PARTS

NAME BRAND COUNTRY
FREQUENCY CONVERTER INVT OR CHINSC TAIWAN
MAIN MOTOR SIEMENS GERMANY & CHINA
TEMPERATURE CONTROLLER HB CHINA
LOW VOLTAGE ELEMENTS DELIXI & CHNT CHINA & GERMANY
SOLID RELAY OMRON & FENGHUA JAPAN & CHINA
KEY BEARING NSK & SKF JAPAN & SWEDEN
OTHER BEARING HRB & ZWZ CHINA
SYNCHRO BELT MITSUBISHI JAPAN
GLUE MACHINE ANJIE OR JINXIN TAIWAN
TRANSMISSION BELT MITSUBISHI JAPAN
ARC CUTTER SANMING CHINA
PNEUMATIC ELEMENT AIRTAC OR CAAP TAIWAN

 

GUARANTEE AND AFTER-SALES SERVICE

 

12 months (from delivery date). Within this period, in case any man-made misoperation or damage of the machine parts caused by the buyer, the charges for spare parts should be borne by the buyer; while non man-made misoperation or damage of the machine parts, the charges should be borne by the seller. If the buyer required seller’s engineer to the buyer’s factory to support some technical service, all the expenses for seller’s engineer will be charged to the buyer.

Buyer can send their staff to be trained in seller factory, the Seller will arrange free food and accommodation for them, the buyer should bear their round-trip tickets. If the Buyer needs the Seller to send engineers to buyer’s country for installing and repairing the machine. All the expenses including round-trip tickets, food and hotel fees for seller’s engineer will be charged to the buyer.Within 30 days,the Buyer will not bear the Seller engineers’ salary; beyond 30 dyas,the Buyer should bear the concerning salary.

 

MACHINE TEST AT SELLER PLANT AND BUYER PLANT

� Test run at seller’s site:

The machine will be tested in the Seller plant and all sizes and shapes foreseen in the contract will be tested, at the presence of a Buyer’s technician, using raw materials supplied by the Seller.

Buyer’s engineers should be at attendance of check & acceptance test according to time and schedule fixed by the Seller. 10 minutes of constant production of the machine for one size need to be done to check the quality, function and production of the machine (for other sizes: 5 minutes for each size at the Standard production speed). To pass the test the efficiency rate has to be more or equal to 85%, while the waste rate has to be less than 2%. Test run certificate need to be signed in duplication by mutual Parties at the end of the test. The signature of the Test run certificate authorizes the shipment of the machine.

� Test run at buyer’s site:

The final acceptance test to be done in the Buyer’s plant and raw materials cost will be at Buyer’s charge.Due to the buyer’s responsibility (no constant raw materials quality, no on time raw material refurnishing, electrical power supplying problems, and any other factory problems), the machine can not be tested, it will be regarded as passing test run at buyer’s site.

 

QUOTATION:

PAYMENT WAY: 30% T/T paid in advance as deposit, the balance will be paid before shipment after buyer inspect the finished machine for quality and quantity in seller factory.

 

DELIEVERY TIME: The ordered machine will be made shipment within 80 working days after seller receive deposit from buyer.

E-catalog:  

Leave a Reply

Your email address will not be published. Required fields are marked *

Are you interested in our products?

Please kindly keep in touch with us via the contact below. You can also call or contact via "Contact Us" on the web page Menu".

+0086-0592-7161501


Email: xmb_sales@163.com

Cell-P: +0086-(0)-15159281187 (whatsapp)

Skype: kevinkevin388

Contact: Kevin

©CopyRight 2006-2016 Xiamen Charm Impact Import & Export Co., Ltd Inc All Rights Reserved.